New water pre-treatment systems increase efficiency and minimizes maintenance


Nortec Humidity introduces the next generation in Water Pre-treatment Systems, utilizing the latest methods to remove contaminants and hard minerals from water. During this two-step process water is pushed through an activated carbon filter to eliminate the chlorine, and then treated with a duplex softening system removing contaminants and hardness caused by calcium and magnesium.

A “Water Pre-treatment System Replacement Program” has been designed for customers who have been using a Nortec Water Pre-treatment System for its expected life span or longer. Nortec service will provide a complimentary quote for a certified technician to inspect or upgrade a customer’s current system. 

Why upgrade your water pre-treatment system?

• Increased reliability and energy savings –Kinetic energy from the moving water is used rather than electric power. 

• Adds efficiency saving money – Countercurrent  and metered regeneration conserves water and reduces salt use.

• Minimal maintenance and repairs – Corrosive resistant valves and tanks, with no back flushing of the carbon filter reduce the need for service.

• Prolong the life of the system – Twin tank design allows for a continuous clean water supply even during regeneration.

The “Water Pre-treatment System Replacement Program” is the first service product to launch in a series of new service products slated for introduction. Nortec is the leading manufacturer of commercial/industrial humidification and evaporative cooling systems for more than 40 years. We have the technology and application expertise to meet the needs of any application. 

 



April 12, 2016


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.