Protect Jobsites With Surface Shields’ New Fire-Resistant Floor Protector and Seam Tape


Cover Shield’s new material is made in the U.S. and can withstand high impact, fire and liquid. It lays flat and is tear resistant while its embossed pattern adds traction and reduces slippage. Designed with strong adhesive and flexible backing, Seam Tape FR(Part # PETW2180FR)makes seaming and repositioning easy. It also includes a pinked edge for a smooth tear, making it ideal for any kind of fire-rated operation.

On average, firefighters respond to more than 10 fires a day at buildings under construction, according to the National Fire Protection Association. Taking steps to prevent fire-related incidents before they happen is the best way to keep fires from starting and to keep them contained if they do.

To ensure Cover Shield and Seam Tape FR keep jobsites safe, both went through rigorous testing to meet fire-rated standards. Both meet NFPA-701 and Cover Shield also has an ASTME-648 Class 1 rating.

“Keeping a jobsite protected and lowering accident rates starts with prevention,” said Elliot Piltzer, director of business development for Surface Shields.“Cover Shield paired with Seam Tape FR creates an unrivaled fire safety system that can be used in applications ranging from medical, nautical, industrial, government projects, universities, and restoration.” 

Cover Shield is available in 36’’ x 393’ 10 mil, 36’’ x 186’ 20 mil, and special order 40 mil rolls. Seam Tape FR comes in cases of 24 rolls, 1.89 in. by 60 yd., and is designed to be used with any Surface Shields product, both fire-rated and non fire-rated.

 



September 4, 2019


Topic Area: Press Release


Recent Posts

Safety Synergy: Infection Prevention That Protects Patients and Workers

For environmental services managers, the central message is that cleaning and disinfection should be governed through an integrated systems approach.


Prefabricated Wall Panels Speed UCF Lake Nona Medical Center Construction

StoPanel systems helped the project meet Florida’s wind-load and impact requirements while supporting a fast, safe exterior installation.


New Dallas Pediatric Campus Reaches Topping-Out Milestone

Projected to open in 2031, the campus will expand inpatient, surgical and ambulatory capacity.


Hospitals Are Energy Super-Users. Why Is It So Hard to Modernize Them?

Managers face the ongoing challenge of finding a practical way to fund improvements while competing with capital priorities.


Encompass Health Rehabilitation Hospital of Bangor Officially Opens

Encompass Health Bangor is the company’s first wholly owned hospital in Maine.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.