Ribbon Cut on New Barnes-Jewish West County Hospital


KAI Build and joint venture partner PARIC Corporation have completed construction on a new 260,000-square-foot Barnes-Jewish West County Hospital in Creve Coeur, Missouri. A ribbon cutting ceremony celebrating the hospital’s grand opening was held on Oct. 29.

The new $130 million hospital is located behind an existing 50-year-old hospital at 12634 Olive Blvd. that will be razed and replaced by green space and additional parking. The replacement hospital is designed as the “hospital of the future” with maximum flexibility, efficiency and technological advancements that allow clinicians to spend more time caring for patients.

“Every detail of the new Barnes-Jewish West County Hospital is designed to improve outcomes, as well as the experience for our patients, families and the team providing their care,” said Bob Cannon, president of Barnes-Jewish Hospital and group president of BJC HealthCare. “The combination of advanced technology, adaptable clinical spaces and a welcoming campus will create the ideal environment for care and healing.”

The new 6-level hospital features 64 private rooms with accommodations for family members; 14 operating rooms, including one robotic operating room; four intensive care unit rooms; separate elevators for staff, patients, visitors and supplies; lobby, waiting areas and café; and capacity to accommodate 32 additional rooms and two operating rooms in response to future demand.

A medical office building will also be constructed attached to the hospital that will include four floors of physician office space totaling 100,000 square feet and parking that will be nested underneath the building. Construction of the medical office building is expected to be completed in 2020.

KAI Build and PARIC provided preconstruction services on the hospital project, including value engineering throughout the design development and project management leadership for the design-assist mechanical, electrical, plumbing and fire protection subcontractors.

In addition to the joint venture management role, KAI Build and sister company The UP Companies also provided project management and field logistical support with a senior project engineer, field superintendent, carpenter foremen, carpenters and laborers. KAI Build and The UP Companies installed the doors and hardware, architectural general works, rough carpentry and expansion joints. The building’s terra cotta exterior was installed by PARIC and The UP Companies.

Christner was the architect for the project, and IMEG was the engineer.



December 4, 2019


Topic Area: Press Release


Recent Posts

Healthcare Workers Need Better Workplaces

New global survey finds frontline healthcare workers struggle with significant gaps in workplace satisfaction.


Protecting Patients Through Design and Compliance at Altru Health System

Case study: Altru Health System’s new “Hospital in the Park” pairs patient-focused design with durable, code-compliant exit solutions built for safety, performance and long-term flexibility.


Novant Health's $1B Expansion Plans Approved

The approval supports the master facility plan for Novant Health New Hanover Regional Medical Center.


What Lies Ahead for Healthcare Facilities Managers

Staffing shortages, rising regulatory scrutiny and accelerating adoption of AI are converging to reshape the way healthcare facilities are managed.


What's in the Future for Healthcare Restrooms?

Workforce shortages, rising hygiene expectations and connected technologies are pushing healthcare restrooms beyond basic utility.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.