Rubberized Roofing Cement and Versatility


New RGA 1 rubberized flashing cement from Mule-Hide Products Co. gives contractors a versatile option for sealing asphalt membranes and flashings while providing up to 10 percent more coverage per case than competitive products. 

RGA 1 can be used to seal various substrates, including: 

  • SBS modified bitumen seams, laps and perimeter edges; 
  • splits, cracks, blisters, metal flanges and punctures in asphalt-based roof membranes and flashings; 
  • tabs, edges, step flashings and valleys in shingled roofs; 
  • seams and edges in rubberized waterproofing projects; 
  • concrete or brick at chimney flashings. 


Packaged in 10-ounce plastic tubes, RGA 1 can be applied to dry and wet surfaces, including submerged surfaces. 

A removable, screw-on tip ensures that product is not lost in the tip, providing up to 10 percent more coverage from each case. When using any cartridge-packaged sealant, product is retained in the tip when the tube is empty because there is no longer pressure to push the remaining sealant out of the tip. With RGA 1, the tip can simply be removed and placed on a new tube, enabling the retained product to be used. With competitive products with fixed-tip cartridges, the retained product is wasted in every tube. 

RGA 1 is offered in a single grade, eliminating the need to switch between winter and summer grades with the change of seasons. 

RGA 1 is approved for use with Mule-Hide Products self-adhered modified bitumen and APP modified bitumen roofing systems. It is not approved for use on single-ply membranes, under APP modified bitumen or torch products with a burn-off film, or in direct contact with Expanded Polystyrene (EPS) or Extruded Polystyrene (XPS).



July 5, 2018


Topic Area: Press Release


Recent Posts

Cleanliness Is a Measurable Outcome

By restoring the distinction between cleaning and cleanliness, managers and staffs can better protect patients from environmental pathogens.


Workplace Safety and the Role of Access Control

Workplace violence and other issues threaten patients, staff and operations, so managers need to rethink security measures and technology.


Henry Ford Hospital Celebrates Construction Milestone for Expansion Project

Crews from BTD, a joint venture created by Barton Malow, Turner Construction and Dixon Construction, are on track to complete the hospital in 2029.


How EVS Leaders Can Support Staff for Better Cleaning

Environmental services is one of the most important departments in healthcare facilities, but it can be a difficult one to manage.


Addressing Infection Prevention Staffing Gaps in Ambulatory and Procedural Care

Traditional models that are based on inpatient bed counts fail to account for the unique demands of ambulatory and procedural settings.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.