Rubberized Roofing Cement and Versatility


New RGA 1 rubberized flashing cement from Mule-Hide Products Co. gives contractors a versatile option for sealing asphalt membranes and flashings while providing up to 10 percent more coverage per case than competitive products. 

RGA 1 can be used to seal various substrates, including: 

  • SBS modified bitumen seams, laps and perimeter edges; 
  • splits, cracks, blisters, metal flanges and punctures in asphalt-based roof membranes and flashings; 
  • tabs, edges, step flashings and valleys in shingled roofs; 
  • seams and edges in rubberized waterproofing projects; 
  • concrete or brick at chimney flashings. 


Packaged in 10-ounce plastic tubes, RGA 1 can be applied to dry and wet surfaces, including submerged surfaces. 

A removable, screw-on tip ensures that product is not lost in the tip, providing up to 10 percent more coverage from each case. When using any cartridge-packaged sealant, product is retained in the tip when the tube is empty because there is no longer pressure to push the remaining sealant out of the tip. With RGA 1, the tip can simply be removed and placed on a new tube, enabling the retained product to be used. With competitive products with fixed-tip cartridges, the retained product is wasted in every tube. 

RGA 1 is offered in a single grade, eliminating the need to switch between winter and summer grades with the change of seasons. 

RGA 1 is approved for use with Mule-Hide Products self-adhered modified bitumen and APP modified bitumen roofing systems. It is not approved for use on single-ply membranes, under APP modified bitumen or torch products with a burn-off film, or in direct contact with Expanded Polystyrene (EPS) or Extruded Polystyrene (XPS).



July 5, 2018


Topic Area: Press Release


Recent Posts

UCI Health Set to Open First All-Electric Hospital

All-electric acute care hospital aims to help University of California’s goal of reducing 90 percent of total carbon emissions by 2045.


Ground Broken on Baptist Health Sunrise Hospital

The planned seven-story, 340,000-square-foot facility is expected to open to patients in 2029.


Rapid City Medical Center to Join Monument Health

The parties will perform further due diligence with the intention to sign definitive agreements and close on the transaction later this spring.


AI Adoption on the Rise Among Leaders

AI usage increased in all markets in the fourth quarter of 2025.


TriasMD Officially Opens DISC Surgery Center at Tarzana

At 10,930 square feet, DISC Surgery Center at Tarzana includes three high-technology operating rooms and 11 patient care bays.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.