SP Industries Introduces CP-1501: High Density, Single Cylinder Stationary Commercial Compactor Serviceable by Front/Rear Load Trucks


SP Industries offers the CP-1501 commercial compactor. With a single cylinder design, this compactor easily handles dry waste and packaging materials. By packing into a front or rear load container, this machine is serviceable by the haulers standard front/rear load route, which eliminates downtime and the need for a second container. The CP-1501 helps lower costs by creating high density, reduced volume material, which requires less space and fewer trips to the landfill or recycling center. Compaction also keeps materials safely undercover and out of sight, preventing waste from becoming windblown debris or a source of pollution. The CP-1501 is ideal for business offices, retail outlets, hotels and universities.

CP-1501 highlights include:

  • Serviceable by Front/Rear Load Trucks

  • Large, clear top opening of 45.6” x 46”

  • Capacity: 1-1/2 cubic yards

  • Volume displacement: 90 cubic yards/hour

  • Cycle time: 50 seconds

  • 39,500 lbs. maximum force

  • Numerous specialty optional equipment and design features

All SP compactors meet/exceed ANSI and OSHA specifications for safety, and are backed by the company’s best-in-industry warranty program. American supplied electrical and hydraulic components are specified for reliability and easy nationwide serviceability.

For more information, visit: bestcompactors.com, email: info@sp-industries.com, or call: 269.793.3232.



May 4, 2017


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.