Stretch Forming by Linetec curves and finishes architectural aluminum products in one location


Stretch Forming by Linetec curves and finishes architectural aluminum productsWausau, Wisconsin – Stretch Forming by Linetec allows architectural product manufacturers to have their metal building components curved and finished in one location. Half-circles, eyebrows and Gothic arches are popular architectural applications.

Customers can ship their aluminum to Linetec for bending and finishing to retain the full finish warranty. Utilizing Linetec’s dedicated fleet of trucks saves customers shipping costs and transit time, as well as reduces material handling and packaging to minimize the opportunity for damage.

Linetec’s full scope of bending capabilities includes annealing and tempering to soften and harden aluminum. Born from the aerospace industry, stretch forming maintains precise dimensions throughout a curve. The extrusion is kept under constant tension, while wrapping it around a form, or die. This produces perfectly contoured products, while limiting or even eliminating wrinkling inside the arc.

In addition to stretch forming, Linetec offers a broad choice of paint, anodize and powder coat, plus field repair and restoration, thermal improvement and other support for finished aluminum products. For more information about Stretch Forming by Linetec, finishing and other services, please call 888-717-1472, email sales@linetec.com or visit http://www.linetec.com.



March 27, 2015


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.