Tubelite expands ForceFront Storm hurricane impact-resistant products


Walker, Mich. - Expanding its ForceFront Storm hurricane impact-resistant products, Tubelite Inc. introduces E44000 Series storefront and entrance systems. Together, they provide a complete impact-resistant system that is easy to fabricate and install.

Tubelite’s E44000 Series’ non-thermal hurricane-impact storefront is a 2.5-by-5-inch flush-glazed, system for use on first floor, single-span applications in impact areas. This impact-resistant, screw-spline framing is prepared for glazing with 9/16-inch laminated glass positioned in the center of the frame. This storefront system meets the requirements High Velocity Hurricane Zone (HVHZ) Windzone 4 with large missile impact, (ASTM E 1886-05/E 1996-09 TAS 201). 

Complementing the storefront system, ForceFront medium stile entrance doors are designed for compliance with HVHZ Windzone 3 with large missile impact (ASTM E 1886-05/E 1996-09). They also are tested to meet the American Architectural Manufacturers Association’s specification, AAMA 1304-02, for forced entry resistance.

The aluminum used to produce Tubelite’s ForceFront Storm systems can be extruded using EcoLuminum™, a high recycled-content aluminum billet composition with eco-friendly, durable finishes. To learn more about these products’ design details, test reports, installation instruction and specific performance data, please visit http://www.tubeliteinc.com.

 



October 14, 2013


Topic Area: Press Release


Recent Posts

The OR HVAC Puzzle: Why Individual Systems Are on the Rise

Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.


Sutter Health Announces Plans for New Santa Clara Medical Center

Sutter projects the medical center will open in late 2031.


Sanford Health Receives $300M Gift for Black Hills Medical Center Campus

Construction is scheduled to begin in 2027 with completion expected by 2030.


Wanted: Scientific Standard for Hospital Cleaning

No accepted criteria exist for defining a surface as clean using microbiologic methods.


NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program

Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.