Tubelite expands ForceFront Storm hurricane impact-resistant products


Walker, Mich. - Expanding its ForceFront Storm hurricane impact-resistant products, Tubelite Inc. introduces E44000 Series storefront and entrance systems. Together, they provide a complete impact-resistant system that is easy to fabricate and install.

Tubelite’s E44000 Series’ non-thermal hurricane-impact storefront is a 2.5-by-5-inch flush-glazed, system for use on first floor, single-span applications in impact areas. This impact-resistant, screw-spline framing is prepared for glazing with 9/16-inch laminated glass positioned in the center of the frame. This storefront system meets the requirements High Velocity Hurricane Zone (HVHZ) Windzone 4 with large missile impact, (ASTM E 1886-05/E 1996-09 TAS 201). 

Complementing the storefront system, ForceFront medium stile entrance doors are designed for compliance with HVHZ Windzone 3 with large missile impact (ASTM E 1886-05/E 1996-09). They also are tested to meet the American Architectural Manufacturers Association’s specification, AAMA 1304-02, for forced entry resistance.

The aluminum used to produce Tubelite’s ForceFront Storm systems can be extruded using EcoLuminum™, a high recycled-content aluminum billet composition with eco-friendly, durable finishes. To learn more about these products’ design details, test reports, installation instruction and specific performance data, please visit http://www.tubeliteinc.com.

 



October 14, 2013


Topic Area: Press Release


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.