Weil-McLain Launches New Aqua Pro Indirect-Fired Water Heaters


Weil-McLain, a leading designer and manufacturer of hydronic comfort heating systems, now offers an advanced line of water heaters with composite construction tanks built to handle even the harshest water conditions. The new Aqua Pro indirect-fired water heaters feature a non-metallic, corrosion resistant design that delivers superior first hour ratings and recovery.

Built with durability and longevity in mind, the AHRI-Certified® Aqua Pro units are available in four sizes – 30, 55, 80 or 119 gallons – making them flexible for a broad range of applications. The unit’s lightweight non-metallic tank allows for easy maneuverability and installation in basements, storage rooms or other tight spaces.

Other features of the Aqua Pro include convenient top connections for easy access, a digital temperature control ensuring accurate delivery temperature for optimal comfort, and no anode to check and maintain.

The unit also features a removable copper finned high-output coil, a durable brass drain valve, and two-inch foam insulation that minimizes any stand-by heat loss. The unit is designed without welds for a seamless tank construction.

The Aqua Pro is designed to install easily into any system and is perfectly matched with any Weil-McLain boiler to provide abundant domestic hot water.

To learn more about the innovative Aqua Pro line of indirect-fired water heaters, visit https://www.weil-mclain.com/products/aqua-pro or contact a Weil-McLain regional sales office at www.weil-mclain.com/en/weil-mclain/about-us/locations/.



February 4, 2019


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.