Wesley Ramirez Joins Stantec’s Healthcare Buildings Team


Wesley Ramirez has joined global architecture, engineering, and consulting firm Stantec as a senior architectural team member, strengthening the healthcare buildings team in the firm’s Sacramento office. Ramirez joins a growing healthcare practice team in Northern California focused on projects in California and beyond. Specializing in acute hospital projects, Ramirez previously served as a healthcare practice leader, and has extensive experience working the Office of Statewide Health Planning and Development (OSHPD).

Healthcare architecture incorporates two of Ramirez’s passions—solving complex technical problems and helping people. He has a diverse industry background in the healthcare sector, ranging from programming to construction administration for OSHPD projects. Ramirez previously served as project manager for the $164 million VA Sierra Nevada Clinic Tower Expansion and Seismic Upgrade. In his role, he led the team for this new five-story, 265,000-square-foot addition, which included designing more than 20 program spaces and a construction plan to build it adjacent to the existing facility.

“We are thrilled to have Wesley join our talented healthcare buildings team in Sacramento,” says Larry Yee, a healthcare principal leader in Stantec’s Sacramento office. “Wesley’s expertise in OSHPD projects will be an asset to our team as we look to continue growing our healthcare practice in California. Throughout his career, he has demonstrated an innate ability to develop and maintain constructive and cooperative working relationships through every contract he has worked on.”

A graduate of the California College of the Arts in San Francisco, Ramirez holds a bachelor’s degree in architecture. He’s also a Northern California Core Team Member or the Lean Construction Institute—a non-profit that advocates for relationship-focused project design and delivery in the architecture and construction industries.

 



November 26, 2018


Topic Area: Press Release


Recent Posts

Study Outlines Hand Hygiene Guidelines for EVS Staff

Researchers find that current guidelines for hand hygiene don’t include EVS workers and suggest indicators to fill that gap.


McCarthy Completes $65M Sharp Rees-Stealy Kearny Mesa MOB Modernization

The completed tenant improvement includes approximately 100,000 square feet of improved space across two buildings and represents an investment of $65 million.


Florida Cancer Specialists & Research Institute Opens St. Petersburg Bayfront Location

The new FCS St. Petersburg Bayfront facility encompasses more than 31,000 square feet.


Healthcare Workers Need Better Workplaces

New global survey finds frontline healthcare workers struggle with significant gaps in workplace satisfaction.


Protecting Patients Through Design and Compliance at Altru Health System

Case study: Altru Health System’s new “Hospital in the Park” pairs patient-focused design with durable, code-compliant exit solutions built for safety, performance and long-term flexibility.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.