Focus: New Construction

Wisconsin Healthcare Project Uses Prefab Components

New ambulatory health center cut a month off of its construction time


Advocate Aurora’s new Ambulatory Health Center in Greenfield, Wis., used 80 multi-trade prefab MEP racks that included long sections of duct work in the corridors, according to an article on the Building Design + Construction website.

Forty percent of the above-ceiling MEP work was built off-site. The construction was completed one month earlier than expected.

Using mobile devices, workers scanned the barcodes to verify the location for each installation. Once on site and verified, the prefabricated racks were lifted to each floor to be connected and attached, a task completed within an hour of each delivery.

Mark Lillesand, a vIce president with project’s construction company,CG Schmidt,  said his firm now “prefabricates everything we can” especially now when the coronavirus has increased the need for jobsite safety. 

According to an  Healthcare Construction + Design article , rehab construction allows for better building information models and modular designs and standardization. 

Read the full  Building Design + Construction article.

 

 



September 2, 2020


Topic Area: Construction


Recent Posts

Creating Healthcare Campus Master Plans That Allow Movement and Respite

A thoughtful campus master plan looks beyond buildings to the corridors and transitional spaces that shape how people experience healthcare environments.


Aspirus Health Celebrates Opening of Chippewa Falls Hospital and Clinic

The new facility combines hospital and clinic services in one location and is designed to support patients with coordinated, patient-centered care.


AdventHealth to Open Aurora Highlands Medical Campus

AdventHealth Aurora Highlands includes a 24-hour freestanding emergency room, outpatient imaging and clinic services.


The Future of Healthcare Facility Construction Projects

Brian Cowperthwaite highlights the invisible work that impacts everyone who walks through a healthcare facility.


Arnprior Regional Health Upgrades Building Controls to Improve IEQ

Case study: They wanted to improve the hospital facility’s IEQ to support patient care and reduce long-term operating costs.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.