Zinwave debuts new wireless coverage solution for elevators


Zinwave, a global provider of wideband distributed network solutions for in-building wireless, today announced that it will showcase its new wireless coverage solution for elevators at the World Elevator and Escalator Expo in Guangzhou, China on May 10-13, 2016. In booth 6E26, Zinwave will demonstrate how its small, fiber-fed remote amplifier units can eliminate the challenges of maintaining consistent cellular and public safety wireless signals inside elevator cars. Already in use at Studio City Macau and planned for deployment at the MGM Resort Macau, Zinwave’s solution delivers the highest cellular performance inside elevators.

In the past, building owners have tried to achieve wireless coverage in elevators by deploying distributed antenna systems (DAS) in elevator lobbies or at one end of each elevator shaft, but the elevator cars’ mobility has made it difficult to maintain a consistent signal, leading to dropped calls and frustrated users. Zinwave’s on-car remote amplifiers ensure a strong and consistent cellular and public safety wireless service inside the car no matter where it moves.

“Cellular users and first responders need to have their mobile devices connect everywhere, even inside moving elevators,” said John Spindler, vice president of marketing at Zinwave. “While most other DAS platforms use large, heavy remote amplifier units that preclude their use on the tops of elevator cars, Zinwave’s thin, light, fiber-fed remote units are a perfect solution.”

For more information about Zinwave, please visit www.zinwave.com.

 

 



May 31, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.