Zurn Facility Achieves LEED Gold Certification


Rexnord Corporation’s new Zurn facility has achieved LEED Gold certification from the United States Green Building Council (USGBC). Eppstein Uhen Architects (EUA) designed and CD Smith constructed the building that serves as a destination for Zurn customers, designers, and industry influencers from around the world. 

The new 52,000 square foot building, located at 511 W. Freshwater Way in Milwaukee’s Reed Street Yards, features an expansive training and customer experience center. The design emphasis was on sustainable features including building positioning to maximize daylighting, sustainable and local material choice and stormwater management. Other features include collaborative workspaces, a fitness center, electric vehicle charging stations and bike storage. 

Zurn plumbing products are used throughout the building and are expected to contribute to a 44 percent reduction in water usage as compared to a building built to code. The location in Reed Street Yards provides easy access to bike paths and public transportation. 

Throughout the entire planning, design, and construction process for Zurn, the goal of achieving LEED Gold was in mind.



April 25, 2017


Topic Area: Press Release


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.