Zurn introduces stainless steel point drain promotes sanitary and safe conditions


ERIE, PA – Zurn Industries, LLC, the leader in engineered water solutions, introduces the Zurn Stainless Steel Point Drain–ideal for work environments where sanitary conditions are critical, such as hospitals, food processing facilities and pharmaceutical applications.

 Zurn’s unique sloped surface design eliminates the buildup of stagnant water, making these new drains far less far less likely to harbor bacteria and other unwelcome microorganisms. The fabricated stainless steel construction of these point drains is also corrosion-resistant. In addition, Zurn's anti-tilt covers provide a safety advantage for work environments

 "Any building owner or manager concerned about sanitation and safety at their facility will find an excellent solution in the Zurn Stainless Steel Point Drain," says Matt Lawrence, Specification Drainage Product Manager for Zurn Industries, LLC. "The innovative design of these drains paired with their fabricated stainless steel construction will deliver superior value and a lower overall cost throughout the product’s life cycle."

 The new Zurn Stainless Steel Point Drain offers multiple options: 12" (square-shaped or round); 8" (square-shaped or round); and 6" (round). They can be adjustable or fixed, and certain models allow for side evacuation. The Zurn Stainless Steel Point Drain is manufactured from type 304 stainless steel with type 316 stainless steel options available.

 

About Zurn Industries

Zurn Industries, LLC is a recognized leader in commercial, municipal, and industrial markets.  Zurn manufactures the largest breadth of engineered water solutions in the industry, including a wide spectrum of sustainable plumbing products. Zurn delivers total building solutions for new construction and retrofit applications that enhance any building’s environment. For more information, visit www.zurn.com.

 



October 3, 2013


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.