Focus: Lighting

Choosing the right LEDs for lighting retrofits

Hundreds of products are available for converting linear fluorescent fixtures to use light emitting diode technologies


Hundreds of products are available for converting linear fluorescent fixtures to use light emitting diode (LED) technologies, according to an article on the FacilitiesNet website.

Some LED devices are being mated with control options such as dimming and occupancy sensing. To get the most out of this technology, envision how your facility’s lighting should look for the next decade (or two) — because it may be that long before LED units start to wear out. 

Three methods exist for converting linear fluorescent lighting (e.g. T5, T8, T12) to LED:

• Replace fluorescent lamps with same-sized tubular LED (TLED) lamps

• Replace each fixture’s lamps, ballast, and lens/diffuser/louver with an LED retrofit kit containing strips of LEDs (sometimes called a “light engine”), a driver (i.e., power conditioning device that replaces a ballast), and new light distribution optics, such as a half-cylindrical lens between angled flat panels

• Replace the entire fixture with a new unit containing LED strips, a dimmable driver (preferably), superior optical distribution, and (perhaps) occupancy and daylight-sensing controls

Read the article.

 



December 5, 2017


Topic Area: Energy and Power


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.