Focus: Lighting

Choosing the right LEDs for lighting retrofits

Hundreds of products are available for converting linear fluorescent fixtures to use light emitting diode technologies


Hundreds of products are available for converting linear fluorescent fixtures to use light emitting diode (LED) technologies, according to an article on the FacilitiesNet website.

Some LED devices are being mated with control options such as dimming and occupancy sensing. To get the most out of this technology, envision how your facility’s lighting should look for the next decade (or two) — because it may be that long before LED units start to wear out. 

Three methods exist for converting linear fluorescent lighting (e.g. T5, T8, T12) to LED:

• Replace fluorescent lamps with same-sized tubular LED (TLED) lamps

• Replace each fixture’s lamps, ballast, and lens/diffuser/louver with an LED retrofit kit containing strips of LEDs (sometimes called a “light engine”), a driver (i.e., power conditioning device that replaces a ballast), and new light distribution optics, such as a half-cylindrical lens between angled flat panels

• Replace the entire fixture with a new unit containing LED strips, a dimmable driver (preferably), superior optical distribution, and (perhaps) occupancy and daylight-sensing controls

Read the article.

 



December 5, 2017


Topic Area: Energy and Power


Recent Posts

Redefining What Mental Health Facilities Look Like

A new Mental Health and Addictions Center uses design and architecture to challenge the stigma and create a more open model of care.


Managing High-Volume Laundry Operations 

Tips and tricks one director has learned in three decades of managing a large, high-volume laundry operation.


University of Pittsburgh Medical Center Falls Victim to Vendor Data Breach

A health information network named “Health Gorilla” improperly accessed medical records available through the national network used to exchange medical information.


Optimizing the Engineering Design of Ambulatory Care Facilities

Designing cost-effective engineering systems is not about minimizing investment but about investing strategically.


Construction Completed on Washington Health Urgent Care Facility in California

The design team maximized the existing footprint to accommodate five exam rooms, a dedicated procedure room and an X-ray room.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.