STARC Systems Manufactures Modular, Re-usable Temporary Containment Walls


STARC Systems manufactures modular, re-usable temporary containment walls for use in a variety of verticals including healthcare settings when there’s a need to protect sensitive occupied areas from the disruption of renovation. 

STARC’s solution is superior to traditional drywall containment, which is noisy and messy to build, disruptive to patients and staff, creates lots of dangerous dust and is thrown out after every job. It takes two people two days to build 100 feet of drywall temporary containment.

STARC’s temporary containment system is quick and quiet to install and 2 people can put up 100’ of wall in one hour with no tools, noise or disruption. The simple lift and drop connection creates an instant airtight connection between the panels.

The 3-layer construction of our panels contain a sound attenuating foam core that eliminates up to 50% of renovation noise which benefits patients, staff,and visitors. Because the system is reusable, it can be used on 100s of jobs and pays for itself after 3-5 uses, virtually eliminating future material and labor temporary containment costs.

 



August 14, 2019


Topic Area: Press Release


Recent Posts

IAQ and Infection Mitigation: Plans Into Actions

To support quality patient care and ensure compliance, managers must stay ahead of environmental and IAQ risks.


Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Dayton Children's Hospital Announces New Rehabilitative Services Building

The new location will feature convenient surface parking, outdoor space to aid in healing and a single-level layout.


The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.