Suffolk named construction manager for Boston Children's Hospital clinical building


Suffolk Construction, one of the most successful, privately held building contractors in the country, announced today that it has been selected to manage construction of the new Boston Children’s Clinical Building (BCCB) for Boston Children’s Hospital. With 565,000 square feet of new construction and renovations to existing connection points in the hospital, this $400 million project is the largest healthcare endeavor in Suffolk’s 33-year history.

The BCCB is an extension to the hospital’s Longwood Medical Area campus and, when complete, it will stand 11 stories high with a two-story mechanical penthouse and four additional stories below grade. The new building will expand the hospital’s current bed capacity to support its continuing growth in domestic and international patient volume and its delivery of high-level tertiary and quaternary care. The facility will also provide space for an expanded cardiovascular program, a new Neonatal Intensive Care Unit (NICU), other inpatient units and clinical and logistical support services such as lab, pharmacy and dietary, and a rooftop healing garden.

Suffolk Construction will be incorporating Virtual Design and Construction (VDC) technologies into the construction and design process to create 3D intelligent models of the project, allowing project stakeholders to study the entire building virtually before breaking ground. Suffolk will also use Lean Construction processes to facilitate team-wide collaboration, minimize issues and efficiently deliver the project. For example, all members of the project team, including master plan architect FKP Architects and building architect Shepley Bulfinch, will be co-located on or near the main campus due to the intense nature of the project.

Boston Children’s Hospital is the preeminent pediatric hospital in the country and the pediatric teaching hospital of the Harvard Medical School. Suffolk has partnered with Boston Children’s Hospital on over twenty projects in the last decade. The firm is currently renovating the hospital’s cafeteria and servery that is located on its main campus. Construction of the BCCB is scheduled to begin in fall 2016 with targeted completion in early 2020.



August 13, 2015


Topic Area: Press Release


Recent Posts

Spaces That Support: Patient-Centered Design for Modern Reproductive Health

Modern facilities must integrate highly specialized laboratories with thoughtful, patient-centered spaces that prioritize privacy, comfort and emotional well-being.


Modernization of Buildings Require Collaboration Across All Disciplines

Retrofitting outdated facilities requires consulting all departments on how to best improve operations.


Children's Health Announces Plans for RedBird Specialty Center in Texas

The system expects to welcome its first patients in December 2027.


How Can Healthcare Facilities Use Efficiency to Drive Climate and Health Goals?

Keith Edgerton discusses how the Health Care Energy & Water Efficiency Checklist helps healthcare connect operational savings with their mission to protect people and the planet.


El Camino Health Rehabilitation Hospital Officially Tops Out

This new 64,000-square-foot, 52-bed inpatient facility in Sunnyvale, California, will enhance rehabilitation services in Santa Clara County.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.