Coolerado launches M50 Downflow air conditioning units ideal for LEED buildings, office space, medical offices and data centers


Denver – Coolerado announces the launch of their M50 Downflow air conditioning unit delivering an Energy Efficiency Ratio (EER) above 40 when used as stand-alone and above 21 when working in concert with DX Roof Top Units (RTU). The M50 Downflow line was designed for easy installation on commercial roof curbs.  The use of roof curbs is a common practice among commercial HVAC installers.  

The M50 Downflow can meet the cooling demands of a building by itself or can be installed to help RTUs during the first stage of cooling and bringing fresh air into the building while reducing the energy consumption and keeping the building cool.   The M50 Downflow can reduce electricity consumption by at least 40% during peak demand hours while helping the building meet rigorous ventilation rates driven by the ASHRAE standard 62.1, ventilation for acceptable indoor air quality. 

“Coolerado continues to innovate to provide customers with the best combination of cost savings, application fit and the highest levels of energy efficiency on the market,” stated Coolerado CEO Tom Teynor.  “By expanding our flagship product lines we are making it even easier for all types of businesses to benefit from our patented HMX cooling technology.  With this new product we demonstrate our commitment to meet our customers’ product needs expectations and consolidate our position in market segments like restaurants, gymnasiums, veterinary offices, nursing homes, schools and libraries all reaping the benefits of less expensive, modern cooling.”

M50 Downflow Benefits

• TCO - Either as stand-alone units or working together with traditional RTUs, cooling systems with Coolerado air conditioners can reduce the total cost of ownership (equipment, installation and operational costs) compared to traditional systems.

• Meet ventilation rates while reducing the energy consumption used for cooling. 

• LEED Points - Coolerado air conditioners are a great option to obtain points on your LEED project.

• Scalability - Simple modular design increases cooling capacity as your cooling demand grows in size or density.

• Ease of installation - Convenient design includes an insulated down flow plenum and stainless steel galvanized skirt for easy installation on commercial roof curbs.

Installation, Pricing and Availability

The M50 Downflow is ready for installation on custom commercial roof curbs. The unit comes with a factory-installed insulated plenum and a galvanized stainless steel skirt for a convenient connection to the roof curb.  The M50 Downflow unit offers simple access to the air filters, motor assembly and controls for easy preventive maintenance. The units are also modular in design so they can be installed flush next to each other to meet increasing cooling needs. For pricing and availability information, please contact your Coolerado Sales Representative.

About Coolerado

Coolerado air conditioners reduce cooling costs as much as 90% using an award-winning, multi-patented and proprietary cooling technology called the Maisotsenko Cycle.  Based in Denver, Colorado and backed by a worldwide network of dealers with units installed in more than 30 countries, Coolerado manufactures its products in the United States. For more information, go to www.coolerado.com.

 



April 25, 2014


Topic Area: Press Release


Recent Posts

Case Study: How NYU Langone Rebuilt for Resilience After Superstorm Sandy

Although the damage was severe, it provided a valuable opportunity for NYU Langone to assess structural vulnerabilities and increase facility resilience.


Frederick Health Hospital Faces 5 Lawsuits Following Ransomware Attack

The lawsuits accuse FHH of inadequate cybersecurity, poor breach notification and failing to protect patients from identity theft risks.


Arkansas Methodist Medical Center and Baptist Memorial Health Care to Merge

They have signed a non-binding letter of intent to complete a shared mission agreement to merge the two organizations.


Ground Broken on Intermountain Saratoga Springs Multi-Specialty Clinic

The clinic is scheduled to open and start seeing patients in the fall of 2026.


Electrical Fire Tests Resilience of Massachusetts Hospital

Signature Healthcare Brockton Hospital used opportunity to renovate key systems and components and expand facility operations.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.