Q&A: Temporary construction barriers

Brad Keyes discusses acceptable temporary construction barriers

By Brad Keyes / Special to Healthcare Facilities Today


Q: Per NFPA 101 2012 edition: are plastic barriers (w/zippers) no longer acceptable around construction areas though the facility is fully sprinkled?

A: No… I wouldn’t say that. But the issue is being reviewed by NFPA and a change may occur next year.

Section 19.7.9.2 of the 2012 LSC says the means of egress of any area undergoing construction, repair, or improvements must comply with NFPA 241, which is the standard for safeguarding during construction operations. Section 8.6.2 of NFPA 241-2009 says temporary construction barriers are required to be 1-hour fire rated, with ¾ hour fire rated doors assemblies if the construction area is not full protected with sprinklers. 1-hour barriers are typically steel studs with 5/8 inch thick gypsum board on both sides, with all seams taped and mudded and all screws heads mudded. If the construction area is protected with sprinklers, then the temporary construction barrier is permitted to be non-rated, but construction ‘tarps’ are not permitted as the non-rated barrier. At this time flame retardant plastic sheeting (i.e. Visqueen) will be permitted as a temporary construction barrier where the construction area is fully protected with sprinklers.

However, this issue is being reviewed by the Healthcare Interpretations Task Force (HITF) of the NFPA. At the June, 2016 meeting of HITF, the members discussed whether or not flame retardant plastic sheeting was acceptable or if it was the same as ‘construction tarps’. At that time there was not a clear consensus so no decision was made. The committee said they would review it again next year.

Unless your AHJ has specifically ruled on this issue, the HITF seemed to say that flame retardant plastic sheeting would be permitted when the construction area is fully protected with sprinklers. But, of course, that is not in writing so it is not official.

I would say continue to use flame retardant plastic sheeting until you learn otherwise.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



October 12, 2016


Topic Area: Regulations, Codes & Standards


Recent Posts

What Does Light Daily Cleaning Miss in Patient Rooms?

Most environmental services workers still clean as if they are wiping dust off a countertop, not disrupting a living, structured community.


Smart Lighting Overhaul Boosts Efficiency, Diagnostics and Wellness at Bryan Health

Case study: LED upgrade and advanced controls across Bryan Health campuses cut lighting energy use by 57 percent while enhancing patient care and staff productivity.


AdventHealth Opens New Freestanding ER in Florida

The approximately 13,700-square-foot emergency room features 12 patient rooms, respiratory therapy services, diagnostic imaging including CT scans, X-ray and ultrasound.


Dirty Floors: How Pathogens Can Accumulate and Spread Underfoot

Studies show that healthcare floors are covered in bacteria and can quickly spread throughout patient rooms. 


WellSpan Health Opens Its Newberry Hospital in Pennsylvania

This marks the opening of its 10th hospital in the region spanning Central Pennsylvania and Northern Maryland.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.