Case study

Brigham and Women’s Hospital uses temporary wall containment during renovation

Temporary wall containment needed for infection control requirements


Overview

Brigham and Women’s Hospital (BWH), a 793-bed nonprofit teaching affiliate of Harvard Medical School in Boston, renovated several dozen rooms on its post-partum floors.

The Challenge

Suffolk Construction was required to meet ICRA Class IV requirements for infection control.  These standards required negative air flow into the renovation area as part of the hospital’s infection prevention program. Suffolk used temporary containment panels for two separate projects on BWH post-partum floors.  

The second major challenge: The post-partum floor would remain open to patients and staff. This required the crews to find a temporary containment solution which would provide sound attenuation and would be easy to assemble and disassemble quickly, so as to minimize the disruptions from renovations.

Solution

“When we begin a project, we meet with the health and safety department as well as infection control. It’s important that our containment systems meet ICRA Class IV requirements.  Also, we need negative air containment; this is key,” said Dustin Clement, superintendent, Suffolk Construction.

STARC Systems provided the ICRA Class IV standards for Brigham and Woman’s Hospital, and more.

Suffolk crews sectioned off the corridor with two containment systems and worked on multiple rooms at a time. As the work was completed, crews would quickly break down the systems and move onto the next rooms. The post-partum floor remained open for patients and staff during renovations.

STARC provided a system that was easy to assemble and breakdown; the fast installation eliminated disruptions in critical patient areas.  Also, the temporary containment walls reduced renovation noise by up to 50%, improving BWH patient satisfaction scores and allowing staff members to carry on with their jobs.

“We had so many comments, nurses didn’t even know they were containment walls. The best compliment we can get is that they don’t realize there’s renovation work going on. People think it’s just part of the building. That’s important in health care,” said Clement.









September 19, 2018


Topic Area: Renovations


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.