Cedars-Sinai Medical Center Begins Emergency Department Expansion

The expansion will add 16,550 square feet and increase the number of care spaces from 60 to 100.

By HFT Staff


Cedars-Sinai Medical Center has embarked on a three-year Emergency Department expansion project that will enhance access and efficiency as well as enable more specialty healthcare. When the project is complete, it will add 16,550 square feet to the department and increase the number of care spaces from 60 to 100.  

The first step in the expansion project is underway. The current patient drop-off section is being converted into an indoor-outdoor patient waiting/triage area that will be roofed, open on one side and equipped with air conditioning and heating. The space also will feature groupings of comfortable chairs and greenery-filled planters. The new patient drop-off area will be on Gracie Allen Drive in front of the North Tower entrance. Valet parking will be available. 

Patients entering the new waiting area will be quickly assessed by a nurse. Patients experiencing serious medical situations will be immediately moved to a treatment room.  

Further efficiencies will result from the addition of what’s called a physician in triage who is paired with a nurse. The department already has one such team and will now have space to add a second. These triage teams will see patients with less serious issues who can be promptly diagnosed, treated and safely sent home, helping to significantly reduce wait times. 

When the expansion is completed, new features will include: 

  • Critical Care Suite—Six rooms designed and equipped to provide care for acutely ill adults and one room created to meet the needs of acutely ill pediatric patients 
  • Behavioral Health—Several beds designated for patients requiring mental health services 


November 9, 2023


Topic Area: Construction


Recent Posts

Study Outlines Hand Hygiene Guidelines for EVS Staff

Researchers find that current guidelines for hand hygiene don’t include EVS workers and suggest indicators to fill that gap.


McCarthy Completes $65M Sharp Rees-Stealy Kearny Mesa MOB Modernization

The completed tenant improvement includes approximately 100,000 square feet of improved space across two buildings and represents an investment of $65 million.


Florida Cancer Specialists & Research Institute Opens St. Petersburg Bayfront Location

The new FCS St. Petersburg Bayfront facility encompasses more than 31,000 square feet.


Healthcare Workers Need Better Workplaces

New global survey finds frontline healthcare workers struggle with significant gaps in workplace satisfaction.


Protecting Patients Through Design and Compliance at Altru Health System

Case study: Altru Health System’s new “Hospital in the Park” pairs patient-focused design with durable, code-compliant exit solutions built for safety, performance and long-term flexibility.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.