Compact, Powerful Model DRZ with Quick-Grip Chuck Offers Maintenance Pros Quick, Clean, Quiet Drain Cleaning


The new Model DRZ economical power drain cleaner from General Pipe Cleaners quickly and cleanly clears clogs from 1-1/4" to 3" sink, tub and laundry lines. 

Fast and easy to use, it’s perfect for maintenance pros. The patented Quick-Grip™ chuck lets you quickly grip or release the cable with just a quarter turn. Three chuck jaws securely hold 1/4", 5/16" and 3/8" Flexicore® cable for a wide range of small-line jobs.

No need to wear-out your arms holding a heavy machine over the drain or under the sink. Light and powerful for its size, the compact design of the Model DRZ lets you operate the machine horizontally on the kitchen counter – or vertically on the floor next to the bathtub. Use the pneumatic pedal to keep your hands free to control the feed and guide hose. 

The tough impact-resistant plastic drum carries up to 50' of 1/4" or 5/16", or 35' of 3/8" Flexicore® wire rope center cable. Transport the lightweight machine to and from jobs with its convenient carrying handle. And the silent motor won't disturb others. 

General also offers the new Model DRZ-PH with a variable speed power cable feed for optimal feeding and retrieving at up to 16 feet per minute. The 4-foot guide tube means you never have to touch the cable. So your hands – and the jobsite – stay clean. 

The rust-resistant aluminum drum on the Model DRZ-PH includes General’s quick-change cartridge system to easily switch between different diameter cables without pulling messy cables from the drum.

Flexicore® cables are made of heavy gauge wire tightly coiled around 49-strand aircraft-type wire rope and heat-treated. The industry standard for drain cleaning snakes, Flexicore cables offer unequalled strength – and the right amount of flexibility. 

For more information, contact the Drain Brains® at General Pipe Cleaners at 800-245-6200 or 412-771-6300, or visit www.drainbrain.com

 



March 9, 2017


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.