Photo credit: Albert Law

Construction Completed on Washington Health Urgent Care Facility in California

The design team maximized the existing footprint to accommodate five exam rooms, a dedicated procedure room and an X-ray room.

By HFT Staff


Ware Malcomb announced construction is complete on a new urgent care facility for Washington Health, located adjacent to Washington Hospital in Fremont, CA. Ware Malcomb’s Pleasanton office provided interior design and civil engineering services for the 3,500 square foot project, located at 2682 Mowry Ave.  

The design team maximized the existing footprint to accommodate five exam rooms, a dedicated procedure room and an X-ray room, delivering an efficient clinical layout within the constraints of the combined suites. On the civil side, the project included upgrades to the path of travel to ensure full code compliance, along with updates to ADA parking to improve accessibility for patients and visitors.  

The interior design reflects Washington Health’s branding through a carefully balanced palette of signature colors and warm wood tones that create a welcoming, patient-centered environment. A wood slat ceiling feature defines the reception area and nurses station, and the warmth of the design in these spaces is reinforced by a blend of solid surface and wood materials.  

Custom wallcovering behind the reception and nurses station mimics movement and water, further tying into the organization’s branding colors. The exam rooms are clean and inviting, while also bringing the warm wood tones into the flooring. 



March 24, 2026


Topic Area: Construction


Recent Posts

Laser Scanning: Reducing Risk in Construction Projects

VDC technology allows teams to define scope based on verified conditions, not on assumptions, reducing change orders and schedule delays.


MOBs Get Smarter and More Complex as Space Pressures Mount

Healthcare facilities teams are turning to data-driven space strategies while adapting to increasingly sophisticated building demands.


Ascension Saint Thomas Sets Date for Groundbreaking on New Hospital and Health Campus

The groundbreaking ceremony will be held on June 16.


Women in Construction Sees Growth on Florida Jobsite

More than 60 women are part of the workforce building a new Orlando Health Hospital.


Managing Soft Surfaces, Clean or Soiled

Soft surfaces present a cross-contamination risk, even if they’re arriving from the laundry. Here are some best practices to handle both soiled and clean linens.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.