Electronics LLC Releases Explosion Proof 12/3 SOOW Linecord with GFCI Protected Outlets


Leader in industrial lighting, Larson Electronics LLC, released an 18-inch SOOW linecord that features a GFCI duplex outlet equipped with a 20-amp rated explosion proof cord cap, that provides ground fault protection in hazardous locations. This rugged extension cord is constructed of 12-gauge 3-conductor wire and provides a safe and effective way to power devices in locations with hot permits.

The EXC-1.5-GFCI-20A-2023-125V from Larson Electronics is an 18-inch chemical and abrasion resistant 12/3 cord terminated with a male NEMA 5-20, 20-amp rated explosion proof cord cap, and includes an inline GFCI and female 5-20C connector. This setup allows operators to safely operate equipment in explosive environments with hot permits by providing ground fault protection.

This linecord allows non-explosion proof equipment to be used in explosive environments. The EXC-1.5-GFCI-20A-2023-125V replaces standard practices of converting non-explosion proof equipment to explosion proof plugs which often becomes too expensive to continue long-term. This GFCI protected linecord system expands the utilization of non-explosive equipment in hazardous areas, so operators can get more out of their equipment.

“With a GFCI protected linecord you no longer need multiple versions of the same equipment for non-hazardous and hazardous locations, which helps cut down on equipment costs,” said Rob Bresnahan, CEO of Larson Electronics LLC. “This system can be used anywhere- indoors, outdoors aerospace applications, mining, offshore, washdown areas, storage facilities, labs, marine vessels – you name it. It’s really an essential piece of equipment to invest in.”

 



May 17, 2018


Topic Area: Press Release


Recent Posts

Better, More Thorough Cleaning Saves Lives

Cleanliness is the first line of defense to protect patients from killer pathogens, but many hospitals refuse to make it a priority.


Encompass Health Opens the Rehabilitation Hospital of Amarillo

The 50-bed inpatient rehabilitation hospital is now accepting patients.


Ground Broken on Sarasota Memorial Hospital-North Port

It is expected to be completed in 2028.


Cost Saving Strategies for Hospital Modernization Projects

Modernization efforts can save healthcare entities money if planned correctly.


Central Jersey Medical Center Reports Ransomware Attack

At this time, there is no evidence that patient information has been misused.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.