Greenheck Introduces Model DS HVLS Fans


Greenheck’s new Model DS direct drive, high volume low speed (HVLS) ceiling fans feature an optimized airfoil design for maximum efficiency and coverage area. Licensed to bear the AMCA Seal for Circulating Fan Performance, Model DS is available in eight sizes ranging from 8 to 24 feet in diameter with performance up to 243,000 cfm. With its unique direct drive motor, the DS is up to 20% more efficient than other HVLS fans and up to 10 dBA quieter.

Greenheck DS fans include a 3.5 ft. drop tube with universal ceiling mount; factory-mounted, wired and programmed variable frequency drive (VFD); and plug-and-play wiring design for quick, easy installation. Every DS fan ships with over 10 standard safety features including fan impact detection, intelligent VFD and motor protection, and redundant fan restraint systems. Full color customization and an array of accessories and control packages are available. Greenheck DS fans are ideal for destratification, comfort cooling and condensation prevention in warehouse, manufacturing, automotive, education and retail applications.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information, visit www.greenheck.com



November 15, 2018


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.