Greenheck lab exhaust fans receive high wind certification


Greenheck’s Vektor-H and Vektor-HS laboratory exhaust fan systems have received Miami-Dade NOA Certification and Florida Product Approval.  The Vektor-H high plume fan with fixed discharge nozzle and the Vektor-HS high plume fan with variable geometry nozzle are the industry’s first laboratory exhaust fan systems to be certified to high wind standards. Both have been tested and approved in accordance with TAS 201: Large Missile Impact, TAS 202: Uniform Static Pressure and ASTM E72 (modified) for wind-borne debris regions up to 140 PSF. Advantages of NOA Certification include quicker project approval; no special enclosures needed around the lab exhaust system to meet construction requirements; and reduced building first-cost by eliminating unnecessary duct runs to these enclosures. NOA Certification is available on 1x1, 2x1 and 3x1 systems and fan sizes 9 through 36.

Greenheck, the worldwide leader in manufacturing and distributing air movement and control equipment, offers the industry’s widest selection of lab exhaust systems to meet any application requirement.

 



February 26, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.