Photo courtesy of Trinity Health Services

Hackensack Meridian Revamps Campus, Expands Treatment Rooms

Medical center will debut expanded emergency department with additional treatment rooms in early 2022

By HFT Editorial Staff


To address growing patient volumes, the Hackensack Meridian Old Bridge Medical Center in Old Bridge, New Jersey, will debut an expanded emergency department with additional treatment rooms in early 2022. To modernize the current campus and optimize the existing 25,000-square-foot emergency department, Hackensack Meridian turned to architecture and design firm FCA to expand their campus.

FCA worked closely with Hackensack Meridian’s clinical team to minimize any on-site disruption during the multi-phase expansion process. In addition to renovating and expanding the emergency department, the Old Bridge Medical Center needed more connectivity between the three buildings to further enhance the campus’ wayfinding and accessibility.

The building’s bright interior shines through to the exterior, allowing it to illuminate the surrounding area throughout the night. The primarily glazed exterior creates a new concourse with visible sightlines to approaching patients and visitors. As a result, people can be seen traversing through the corridor, which helps visitors and new patients easily navigate the facility.

FCA also added warmth to the dated clinical spaces through clean, modern surfaces while using color as a wayfinding tool. The interior wall of the concourse exudes a prominent color wash, starting with the Hackensack Meridian Health branded blue at the main lobby and later transforming into a warm red to reinforce the emergency department walk-in entry point. The concourse is very neutral to allow the color gradation to be prominent.

Within the emergency department, the color palette intentionally creates a calming effect for patients and staff. Subtle color shifts in various locations help patients and visitors recognize the different areas within the emergency department. A more concentrated level of finish is used at the nurse stations to emphasize the location of the clinical teams and indicates where individuals can go for assistance.

To ensure a cohesive design, FCA added a new main entrance connecting directly to the new campus concourse. The efficient layout of the expanded emergency department is set to decrease patient wait times and lend to an overall smoother visitor experience.



March 1, 2022


Topic Area: Construction


Recent Posts

Two Steps to Controlling the Hot Zone

Strategy for disrupting dry-surface biofilm begins with a simple premise: You cannot disinfect what you cannot reach.


RiverSpring Living Breaks Ground on River's Edge Senior Living Community

Occupancy is expected in December 2028.


Encompass Health Reveals Plans to Build Inpatient Rehabilitation Hospital in Post Falls, Idaho

The hospital is expected to open in 2028 and will be part of Encompass Health's national network of inpatient rehabilitation hospitals.


Creating Compassionate Spaces in Healthcare

A new bereavement room at the Children’s Hospital of Michigan NICU aims to provide peace and privacy for families.


Study Shows Connection Between Odor and Patient Experience

A 2024 study identifies the top smells in hospital waiting rooms and how they impact the patient and visitor experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.