Haws introduces new bottle fillers to extensive hydration line


Haws is pleased to announce the launch of multiple new Bottle Fillers to its existing bottle filler and drinking fountain product lines. The 1920 and 3377BF is a versatile, satin-finish bottle filler with push button operated stainless steel valve offering simple installation, compact size and low maintenance. Both units are certified to NSF 61 & 372; Federal Safe Water Drinking Act, CA Health & Safety Code 116875 with 100% lead free waterways and 1GPM (3.78LPM) laminar flow.

Model 1920 is a versatile, wall-mounted, bottle filler with simple installation when mounted alone or above a drinking fountain. The universal bottle filler is ideal for indoor or outdoor applications, with various finishes and freeze-resistant options available.

Model 3377BF is a bottle filler attachment with pedestal extension for the 3377 outdoor, barrier-free, green powder coated pedestal drinking fountain.

For more information on Haws, visit www.Hawsco.com and follow us on our blog at blog.hawsco.com.

 

 



August 1, 2016


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.