High-impact signs from Visual Workplace help create safe lean workplaces


Visual Workplace, Inc. offers a comprehensive line of 5S, Lean and Safety solutions for the workplace, including: floor-marking tape and decals, tool shadows, pegboards, quick-grids and dry erase boards. Visual components are a critical part of a lean workplace, providing a method for process control, work instructions, inventory control and eliminating waste in terms of time, space and materials.

Visual Workplace also offers free resources for companies to learn more about Lean Manufacturing at their Educational Resource Center, which features articles, forms/templates, books and DVDs, product guides, videos and webcasts. 

Visual Workplace 5S, Lean and Visual Management products include:

• FLOOR-Mark® Tape and Floor-Mark® Symbols to mark pathways and provide visual guidance throughout facilities

• Printed, custom signs and banners to deliver important safety messages

• SHADOW-Mark® tool shadow tape, pegboard and accessories to designate specific locations for every item

• Pre-made OSHA safety and facility signs to inform, protect and bring awareness to conditions

• Floor and A-Frame signs to display safety information or other important messages

• Custom Dry Erase Boards and QUICK-Grid® to collect data and share information

• Label printer to create custom, adhesive backed labels and bar codes up to 4” wide

For more information visit www.visualworkplaceinc.com.

 



March 1, 2016


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.