Houston Methodist Prepares for New 26-Story Hospital Tower

The new tower will house a new and larger emergency department, hundreds of additional hospital beds and more.

By HFT Staff


Houston Methodist has begun site preparation for a 26-story hospital tower in the Texas Medical Center. The new tower will house a new and larger emergency department, enhanced imaging services and hundreds of additional hospital beds. 

The $1.4 billion Centennial Tower project will connect to the Paula and Joseph C. “Rusty” Walter III Tower, which opened in 2018 and houses the Houston Methodist DeBakey Heart & Vascular Center and the Houston Methodist Neurological Institute.  

When completed, Centennial Tower will: 

  • house nearly 400 patient beds, including 175 new beds and 207 beds to replace those in Houston Methodist’s main building, which will be demolished along with West Pavilion  
  • replace existing space for transplant medicine, intermediate care and surgical intensive care 
  • replace seven operating rooms with the latest technology and add two additional operating room suites and enhanced radiology services. 

With 54 beds and additional suites, the new emergency department will be nearly double in size. In addition, the larger, more convenient emergency entrance at John Freeman Boulevard and Bertner Avenue will include pedestrian and ambulance drop-off sites, ambulance bays and easy in-and-out access. 

Centennial Tower’s 14th floor will feature an outdoor rooftop garden complete with trees and landscaping to provide patients, visitors and staff with an outdoor respite in the heart of the Texas Medical Center. 



May 12, 2022


Topic Area: Construction


Recent Posts

Healthcare Security: To Arm Or Not To Arm?

Deciding whether or not to hire armed security personnel requires that managers understand a range of critical considerations.


False Alarm at Kansas Hospital Highlights Importance of Alarm System Reliability

After a two-hour search of the hospital and nearby medical facilities, no threat was found.


Integrated Oncology Network Caught Up in Data Breach

The network first learned of the incident on April 11, 2025.


ISSA Introduces Healthcare Platform to Advance Safer, Cleaner Patient Environments

This new resource integrates training, research and cross-sector collaboration to raise care standards and improve patient outcomes.


Third-Party Tracking Settlement is a Compliance Wake-Up Call for Healthcare Facilities Managers

Mount Sinai Health System agrees to a $5.3 million settlement to resolve claims it improperly shared patient data with Facebook through tracking tools.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.