IMETCO Introduces an Innovative Approach to Re-Cladding Aging Facilities


 IMETCO is offering a refined solution for re-cladding aging facades. R2™ (Revive & Reclad) is a customized inclusive engineering services package designed to help building owners, architects or any other decision maker choose the proper re-cladding solution for their specific building based on existing conditions.

This service is designed for buildings with metal, brick, concrete or EIFS facades that are deteriorating or in need of aesthetic improvement. Re-cladding options may include an entire rainscreen application or be as simple as new metal wall panels retrofitted over the existing. R2 is a four-phased approach that includes value-added services combining project renderings, material selections and engineering assessments.

“Revive and Reclad efficiently opens the door for facility owners to consider the truly sustainable option of resurfacing and protecting their existing facility, while incorporating state-of-the art air, moisture, and thermal management. And along with that, it’s aesthetically pleasing,” – said Joe Mellott, IMETCO vice president. 

For more information, visit www.imetco.com



February 19, 2020


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.