Larson Electronics LLC Releases 5-Stage Steel Wall Mounted Light Mast


Industrial lighting expert, Larson Electronics LLC, has announced the release of an aluminum wall mounted light mast that can quickly and safely deploy lights, cameras and other equipment up to 11 feet. This 5-stage collapsible light tower has a unique wall mount which keeps the unit off the ground, maximizing floor space.

The LM-WM-11-4.5-5S-ALU from Larson Electronics is a wall mounted light tower that can deploy LED, HID, halogen and metal halide fixtures, among other various industrial equipment. This telescoping 5-stage light mast extends up to 11 feet and can be collapsed to 4.5 feet in the case of applications that need a smaller light footprint. The mast is elevated via one 1,000-pound manual winch with 3/16” galvanized cable. The addition of a special proprietary mast guidance system helps the tower stand sturdy against high winds up to 125 miles per hour.

This telescoping mast is built with square steel tubing, finished in a powder coating and can support and lift 125 pounds of equipment. The LM-WM-11-4.5-5S-ALU features a wall mounting bracket near the bottom of the tower, which accepts four bolts for strong and stable wall mounting. This mounting configuration is ideal for applications that need more floor space.

This 5-stage light mast can be custom built to tailor to operator needs with longer mast sections, large mounting plates and an optional electric winch for faster deployment.

“The wall-mount on this mast keeps it off the floor allowing for more space in the work area and eliminating any tripping hazard,” said Rob Bresnahan, CEO of Larson Electronics LLC. “It also places the manual winch at a comfortable height making deployment of lights and equipment easy.”

Larson Electronics LLC



September 21, 2018


Topic Area: Press Release


Recent Posts

The Debate on Laundering Microfibers in Healthcare

Should microfibers be single-use or reusable? Researchers have opinions on both.


Construction Begins for New Cancer Center at OhioHealth's Administrative Campus

The project’s completion date is estimated for late 2028.


Sutter Health and Alina Health to Form 39-Hospital System

The organizations anticipate closing by the end of 2026, pending regulatory approval.


IAQ and Infection Mitigation in Aging Facilities

Challenges can contribute to elevated risks related to patient safety, staff comfort and retention, and heightened regulatory and accreditation scrutiny.


Preventing Pests: Effective Measures in Healthcare Facilities

How integrated pest management can protect patient health.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.