Larson Electronics Releases Explosion-Proof Network IP Camera, Built-in Infrared, 4.0MP Resolution, 20 FPS


nt sectors, announced the release of an explosion-proof network IP camera with built-in infrared light. This remote inspection camera is designed for use in hazardous locations and is explosion, dust and ignition proof, weatherproof and tamper resistant. This camera provides the operator with a live feed from inside tanks, reactors, vessels or other locations.

The EXPCMR-IP-POEP-4MP-IR-1XLE3 explosion-proof network IP camera features a built-in 1/3-inch progressive-scan CMOS image sensor that delivers up to 4.0MP resolution at 20 FPS. This unit offers a wide-angle fixed lens with an 83-degree field of view and is made to cover large areas and workspaces. This 17-watt camera provides a crisp and clear image and captures images in low-light conditions. An NVR is necessary for stream recording, or live-view can be done without an NVR system via report access to the camera.

Larson Electronics’ explosion-proof camera is available in spot and floodlight configurations and features four Edison Edixeon three-watt LEDs, producing 180 lumens, arranged in rows and paired with high purity 10-degree optics to produce a narrow spot beam. This unit is compatible with PoE+ devices and links up to a customer provided DVR system via a customer provided RJ45 Ethernet cable. The device is suitable for use in the remote observation of external facilities, monitoring of cleaning and more.



April 24, 2019


Topic Area: Press Release


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.