Leviton launches next generation Evr-Green charging station that delivers up to 7.7 kW of power


Leviton unveiled the Evr-Green® 320 Level 2 Charging Station, the latest addition to its Evr-Green® line of residential, commercial and public electric vehicle charging systems. The updated device provides up to 32 amps at 208 or 240 volts AC (7.7 kW maximum output) and is designed with an improved installation process to better meet customers’ needs and to reduce the charge time of next generation SAE J1772™ plug-in electric vehicles.   

The Evr-Green® 320 Level 2 Charging Station features a unique charge connector assembly that is rated up to 40 amps and a durable, weatherproof NEMA Type 4 steel enclosure. The device is available in a hard-wired installation, and can be cord-connected and mounted to the Leviton installation kit if required. The charging station is also available with either an 18-foot or 25-foot charging cable, to provide more flexibility for mounting locations for customers. 

“To better meet our customers’ needs, we designed the Evr-Green® 320 to meet the rigors of home and workplace,” said Manoj Karwa, Senior Director for Leviton’s Commercial & Industrial Business Unit. “The improved design is constructed of durable powder-coated galvanized steel to withstand harsh environmental conditions, and the charging station can easily be installed on a wall or freestanding with our single or dual pedestal system.”

The Evr-Green® 320 has been tested in the USA, Japan & Korea by several major automakers, has been used in nearly 3,000 dealerships and is preferred in 11 electric vehicle platforms. The charge connector also has an inexpensive lockable secure system to prevent unauthorized use and uses low carbon footprint materials.

Leviton's entire family of Evr-Green® products features carefully selected materials that are environmentally friendly, including lead-free electronics and minimized packaging waste through the use of recycled content.

The Evr-Green® 320 Level 2 Charging Station includes a three-year limited warranty and complies with all industry safety and performance standards, including the current National Electrical Code®. The device will be available through Leviton's distribution channels: e-store, electrical distributors, retail partners and automakers starting in May 2016.

 

 



August 14, 2015


Topic Area: Press Release


Recent Posts

EV Charging Station Design: Ensuring Patient Access

The question is not whether to install charging infrastructure — the organization eventually will have to — but how to do it without disrupting patient care.


Sanford Health and Prairie Lakes Healthcare System Merge

Prairie Lakes Healthcare System will transition to the Sanford Health name and brand while preserving and expanding health services across the communities it serves.


Sedgebrook Falls Victim to Data Incident

The organization detected the event on May 5, 2025.


How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.