Focus: Fire-Life Safety / Column

Life Safety Q&A: Locked exit doors from psychiatric unit

Brad Keyes continues the discussion on locked exit doors from psychiatric unit

By Brad Keyes / Special to Healthcare Facilities Today


Q: I am a consultant and I have a 30 percent sprinklered high-rise hospital with locked psychiatric units. The state authority made them unlock the stairwell doors under the 2000 LSC. The stairwell doors were locked with a key. With the 2012 LSC, can those doors have delayed egress installed for security of patients or does the entire building need to be sprinklered?  The smoke compartments into the stairs in question are sprinklered.

A: No… they cannot install delayed egress locks on any door in the building because section 7.2.1.6.1 of the 2012 LSC requires the entire building to be either fully protected with sprinklers or smoke detectors. I’ve yet to find a hospital that is fully protected with smoke detectors, so it is a safe bet it is not. Since the building is not fully protected with sprinklers, then they cannot install delayed egress locks (7.2.1.6.1), elevator lobby locks (7.2.1.6.3), or specialized protective measure locks (19.2.2.2.5.2). Their only recourse is to install clinical needs locks (19.2.2.2.5.1) or access-control locks (7.2.1.6.2, but access-control locks do not lock the door in the path of egress).

Did the state agency explain why they could not lock the stairwell exit doors via clinical needs locks (19.2.2.2.5.1)? Perhaps the hospital did not comply with all of the requirements found in 19.2.2.25.1, or perhaps it was a personal preference of the state inspector.


Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



July 26, 2017


Topic Area: Security


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.