Q: Is there a code in the 2012 LSC about testing electrical receptacles around hospital beds?
A: Well… actually, that would be in the NFPA 99-2012 code/standard. Take a look at section 6.3.4.1.3, which says receptacles not listed as hospital-grade, at patient bed locations and in locations where deep sedation or general anesthesia is administered, must be tested at intervals not exceeding 12 months. No other routine receptacle testing is required.
So, if you do install hospital-grade receptacles in the above locations, then you do not have to do any testing at all, after the initial installation test required in 6.2.4.1.1.
Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.
Mature Dry Surface Biofilm Presents a Problem for Candida Auris
Sutter Health's Arden Care Center Officially Opens
Insight Hospital and Medical Center Falls to Data Breach
The High Cost of Healthcare Violence
EVS Teams Can Improve Patient Experience in Emergency Departments