Luxaire expands its Eclipse rooftop replacement solution with a new packaged heat pump that features advanced control technology


The Luxaire brand of Johnson Controls is expanding its Eclipse rooftop replacement solution with the addition of a new heat pump. Available in 3- to 8.5-ton capacities, the heat pump saves contractors time with an exact-fit footprint and advanced control technology that contribute to easy installation, setup and maintenance.

The exact-fit replacement design matches heat pumps and all units in the Luxaire rooftop replacement solution to other manufacturers’ units and reduces installation time, cost and complexity by eliminating the need for a curb adapter.

Simplicity Smart Equipment (SE) Controls also contribute to system setup, optimization and monitoring that is far easier than older, electromechanical controls. This next generation control system is a standard feature on all Eclipse gas/electric, electric/electric and heat pump packaged and commercial split system configurations.

The system’s advanced design also offers an optional Mobile Access Portal (MAP) Gateway that provides access to the SE control system using a smartphone, tablet, laptop or remote PC. An optional Fault Detection and Diagnostics (FDD) saves contractors time by providing detailed alerts if issues arise, and quick ship options improve product availability. 

Additional features of the new heat pumps include adjustable defrost and three heat capacities, two cabinet heights and footprint sizes and a choice of cooling or electric heat configurations.     

For more information, visit www.Luxaire.com/Eclipse.



June 1, 2016


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.