MENOMONEE FALLS, Wis. - Leading elevator drive and solutions manufacturer Magnetek, Inc., has announced its subsidiary, Magnetek (UK) Limited, has extended its arrangement with the historic National Lift Tower, located in Northampton, UK, into a third year. The strategic partnership extension will allow the Company to advance its dynamic elevator software and hardware development schedule.
The National Lift Tower was built in the late 1970s and was officially opened by Queen Elizabeth II in 1982. The privately owned research and testing facility stands 418.1 feet tall and is the tallest tower of its kind in Europe. At its base, the tower is 47.9 feet in diameter and tapers to 27.9 feet at the top and contains six lift shafts of varying heights and speeds including a high speed shaft.
"The Lift Tower facility provides us with the opportunity and ability to test and prove out hardware concepts, install new products, and analyze new software advancements in a working environment before they are released,” said Brian Preston, General Manager of Magnetek’s UK operations. “We are pleased to continue our work at the Lift Tower and look forward to advancing our research and development partnership with this historic facility."
About Magnetek
Magnetek, Inc. is a leading provider of Energy Engineered® digital power and motion control systems used in elevator, overhead material handling, and mining applications. The Company is the world’s largest independent builder of highly integrated digital motion control systems for high-rise, high-speed elevators. Magnetek is North America’s largest supplier of digital drive systems for industrial cranes, hoists, and monorails, and is a leading provider of radio remote controls, motors, braking and collision avoidance subsystems. Magnetek is also a leading independent supplier of digital motion control systems for underground coal mining applications. Headquartered in Menomonee Falls, Wis., in the greater Milwaukee area, Magnetek operates manufacturing facilities in Pittsburgh, Pa., and Bridgeville, Pa., as well as Menomonee Falls. Magnetek’s UK office is located in Unit 3 Bedford Business Center, Mile Road, Bedford, MK42 9TW UK. Phone: +44 (0) 1234 349191; Fax: +44 (0) 1234 268955.
Magnetek accelerates elevator drive development with National Lift Tower partnership
October 9, 2013
Topic Area: Press Release
Recent Posts
Preparing Healthcare Facilities for Wildfire Air Quality Events
Wildfire smoke puts pressure on mechanical systems already working hard to maintain controlled indoor environments.
UW Health Set to Open Expansion at East Madison Hospital
The $140 million project adds 120,000 square feet to the hospital, expanding its footprint to roughly 620,000 square feet.
Central Ohio Primary Care Physicians Falls Victim to Cyberattack
While the full extent of the incident is still under review, our initial investigation discovered that there are approximately 1.4 million individuals impacted.
The Role of Biophilic Design in Healthcare Facilities
Nature-inspired design can support staff well-being and create more welcoming, human-centered healthcare environments.
TriStar Centennial Medical Center Invests $90M in Women, Children's Hospital Expansions
The multi-year project will bring significant improvements to both hospitals.