MENOMONEE FALLS, Wis. - Leading elevator drive and solutions manufacturer Magnetek, Inc., has announced its subsidiary, Magnetek (UK) Limited, has extended its arrangement with the historic National Lift Tower, located in Northampton, UK, into a third year. The strategic partnership extension will allow the Company to advance its dynamic elevator software and hardware development schedule.
The National Lift Tower was built in the late 1970s and was officially opened by Queen Elizabeth II in 1982. The privately owned research and testing facility stands 418.1 feet tall and is the tallest tower of its kind in Europe. At its base, the tower is 47.9 feet in diameter and tapers to 27.9 feet at the top and contains six lift shafts of varying heights and speeds including a high speed shaft.
"The Lift Tower facility provides us with the opportunity and ability to test and prove out hardware concepts, install new products, and analyze new software advancements in a working environment before they are released,” said Brian Preston, General Manager of Magnetek’s UK operations. “We are pleased to continue our work at the Lift Tower and look forward to advancing our research and development partnership with this historic facility."
About Magnetek
Magnetek, Inc. is a leading provider of Energy Engineered® digital power and motion control systems used in elevator, overhead material handling, and mining applications. The Company is the world’s largest independent builder of highly integrated digital motion control systems for high-rise, high-speed elevators. Magnetek is North America’s largest supplier of digital drive systems for industrial cranes, hoists, and monorails, and is a leading provider of radio remote controls, motors, braking and collision avoidance subsystems. Magnetek is also a leading independent supplier of digital motion control systems for underground coal mining applications. Headquartered in Menomonee Falls, Wis., in the greater Milwaukee area, Magnetek operates manufacturing facilities in Pittsburgh, Pa., and Bridgeville, Pa., as well as Menomonee Falls. Magnetek’s UK office is located in Unit 3 Bedford Business Center, Mile Road, Bedford, MK42 9TW UK. Phone: +44 (0) 1234 349191; Fax: +44 (0) 1234 268955.
Magnetek accelerates elevator drive development with National Lift Tower partnership
October 9, 2013
Topic Area: Press Release
Recent Posts
The OR HVAC Puzzle: Why Individual Systems Are on the Rise
Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.
Sutter Health Announces Plans for New Santa Clara Medical Center
Sutter projects the medical center will open in late 2031.
Sanford Health Receives $300M Gift for Black Hills Medical Center Campus
Construction is scheduled to begin in 2027 with completion expected by 2030.
Wanted: Scientific Standard for Hospital Cleaning
No accepted criteria exist for defining a surface as clean using microbiologic methods.
NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program
Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.