MaxLite releases ballast-compatible LED U-bend lamp as plug-and-play replacement for fluorescent tubes


MaxLite expands its DirectFit line of ballast-compatible LED products with a T8 U-bend Lamp designed to upgrade fluorescent fixtures with energy-efficient lighting in a matter of seconds.

Suitable for use in totally enclosed, bi-pin socketed luminaires, such as 2-by-2 foot T8 U-bend fluorescent fixtures, the DirectFit U-bend Lamp plugs into the existing ballast without any extra labor or re-wiring. The 16-watt replacement lamp features a compact light engine that delivers 1,800 lumens using an extra wide, 320-degree beam angle. An integral driver is stored within the tube’s cap to optimize thermal performance and eliminate dark spots, allowing for bright, even illumination to run continuously from end to end of the U-shaped tube.

The DirectFit U-bend Lamp is compatible with most instant-start T8 ballasts. Offered in color temperatures of 3500K, 4000K and 5000K, the lamp delivers excellent color rendering with an 85-plus CRI. Each tube is rated to a lifetime of 50,000 hours at L70 standards and comes backed by MaxLite’s five-year limited warranty and lifetime product support.

 



July 14, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.