Mecho Introduces SolarTrac 4.0 Automated Shade System


Mecho, a global leader in commercial window coverings, introduces SolarTrac 4.0, a technologically-superior automated window shading control system designed to maximize occupant and building performance through daylight management.

The patented SolarTrac 4.0 merges the science of predictive algorithms with real-time weather conditions to provide a scalable solution with precise and predictive performance for control that ranges from single floor control to individual commercial buildings to an entire healthcare facility. These technologies enable SolarTrac 4.0 to raise or lower window shades to maximize natural daylight coming into a building, increase energy efficiency, enhance occupant comfort and performance, improve building energy management, and maintain aesthetics—all while preserving valuable views to the outside.

SolarTrac 4.0 incorporates the sun’s precise position based on date, time, building GPS location, and glass façade orientation—as well as shadows and reflection caused by surrounding buildings—to raise or lower window shades to harvest the maximum amount of daylight. SolarTrac4.0 is software-based; allowing it to be managed by multiple users on-site or even remotely and is the first on the market to include self-diagnostics. Please visit Mecho to discover the power of SolarTrac and the new features of SolarTrac4.0.

Since 1969, Mecho® has been a trusted partner to architects, designers and engineers to help bring their design visions to life. Mecho is consistently at the forefront of revolutionizing window shades and thrives in hard-to-solve design and technical challenges. Mecho embraces projects that call for non-rectangular, sloping, high, wide, difficult-to-access, and other non-standard windows.



April 4, 2019


Topic Area: Press Release


Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.