Medical Office Buildings Connects Patients to Nature

Design incorporates green moss wall that cleanses VOCs from air and reduces noise

By By Dan Hounsell


The link between interior design and patient health is firmly established, so the challenge now for designers and architects is putting the concept into practice in facilities. For one Florida project, that means bringing nature into close proximity with patients.

Construction has finished on the new Flagler Health+ Village at Nocatee in Ponte Vedra, Fla. The $19 million design-build project includes a multi-story medical office building totaling 40,000 square feet, according to Healthcare Construction+Operations. The building’s biophilic design is intended to connect visitors and staff to the surrounding natural environment. It incorporates a green moss wall that helps cleanse the air of toxic volatile organic compounds, reduces noise and adds a clutter-free, natural design element to the space. The site also includes large expansive views to the exterior, a curtain wall, airy skylights and a 1-acre park.

Stellar partnered with architects at RS&H to complete the new facility, and despite the challenges presented by the COVID-19 pandemic, the project was completed safely and on schedule.

Built on a 4 acre site in the Nocatee Town Center, the project is located in the heart of the growing master-planned community and includes a variety of comprehensive medical services, including: primary care and family medicine; laboratory and diagnostic services; concierge medicine; imaging (MRI, CT scans, X-ray, ultrasound and mammography); heart and vascular care; orthopedics; health coaching; and wellness and educational classes.



March 11, 2021


Topic Area: Interior Design


Recent Posts

Cleanliness Is a Measurable Outcome

By restoring the distinction between cleaning and cleanliness, managers and staffs can better protect patients from environmental pathogens.


Workplace Safety and the Role of Access Control

Workplace violence and other issues threaten patients, staff and operations, so managers need to rethink security measures and technology.


Henry Ford Hospital Celebrates Construction Milestone for Expansion Project

Crews from BTD, a joint venture created by Barton Malow, Turner Construction and Dixon Construction, are on track to complete the hospital in 2029.


How EVS Leaders Can Support Staff for Better Cleaning

Environmental services is one of the most important departments in healthcare facilities, but it can be a difficult one to manage.


Addressing Infection Prevention Staffing Gaps in Ambulatory and Procedural Care

Traditional models that are based on inpatient bed counts fail to account for the unique demands of ambulatory and procedural settings.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.