NEMA: New Standard Minimizes Cable Energy Loss for Power over Ethernet Lighting Systems


The National Electrical Manufacturers Association (NEMA) released a new installation standard designed to ensure minimal energy loss for power over ethernet (POE) lighting systems. ANSI Accredited Standards Committee on Lighting Systems published ANSI C137.3 American National Standard for Lighting Systems—Minimum Requirements for Installation of Energy Efficient Power Over Ethernet (POE) Lighting Systems. NEMA serves as the secretariat for the standard. 

The energy efficiency of a POE lighting system depends on three elements: power source equipment (PSE) efficiency, powered device (PD) efficiency, and cable energy losses. This standard specifies cable and installation practices to limit the electrical energy losses of the cable between the PSE and the PD. 

“ANSI C137.3 provides the much-needed standardization of cable requirements for use by installers of PoE lighting systems. It ensures that POE Lighting will provide high-energy efficiency in every building installation that is complying with this standard,” said Robert Hick, vice president of R&D Engineering, Leviton Lighting and Energy Solutions, and technical coordinator of ANSI C137.3. 

NEMA’s Lighting Systems Division, as the secretariat of ANSI’s ASC C137 for Lighting Systems, is looking for industry experts in the User and General Interest categories to participate in standards development activities. Contact NEMA at nemalighting@nema.org if you are interested. Please indicate your interest category and your area of expertise.



July 11, 2017


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.