NFMT event to include seminar on energy reduction — a Harvard Medical School case study

The 2017 National Facilities Management & Technology event offers three full days of education, speakers, networking with peers, and a giant expo hall. All for free.


This year's National Facilities Management & Technology (NFMT) event will include a seminar on energy reduction — a Harvard Medical School case study.

Energy use reduction has two very distinct benefits:  1). Less demand reduces the production requirement and consequently adverse environmental impacts. 2). Reduced facility energy costs. This session will describe, in depth, the measures taken by Harvard Medical School Facilities Group to attain a 17% reduction in energy use from 2011 through 2016.This case study illustrates the accomplishments in a wet laboratory medical research setting constrained by HVAC requirements. Some examples include air change rate reductions/setbacks, ASHRAE Level II audits, re-commissioning, and continuous commissioning. Proven techniques for success and some of those that failed will be provided in detail.

Learning objectives:
1. Discuss the entire population of measures considered by Harvard Medical School
2. Review the most and least effective measures undertaken
3. Understand the difficulties encountered in implementing changes and some techniques used to overcome challenges
4. Recap lessons learned

The session, scheduled for March 9 at 9:00 a.m. (EST), will be given by Peter Stroup, P.E., Director of Facilities at Harvard Medical School.

The event will be held in Baltimore on March 7-9, 2017.

Check out the NFMT website for more information.

 

 

 

 



February 23, 2017



Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.