New Hospital’s Design Process Embraces Real Life

Architects, nurses and physicians collaborate to refine design of critical rooms at Cedars-Sinai Marina del Rey Hospital

By Dan Hounsell


No more models, drawings and photos. Architects and interior designers working on the new nine-story Cedars-Sinai Marina del Rey Hospital took their work to a whole new level.

To guide the hospital’s design, the architects built sample patient care rooms down to the door knobs, according to Newswise. Then they invited physicians and nurses to visit, inspect and give feedback before the new hospital breaks ground later this year, said Zeke Triana, AIA, vice president of facilities planning, design and construction at Cedars-Sinai.

The team created everything, down to cabinetry, doors, hinges, and hardware in the rooms. The healthcare workers who toured the half a dozen realistic rooms had plenty of suggestions, ranging from the mundane to the high-tech.

For example, staff stood inside an emergency department exam room and asked the architects to rotate the bed and head wall 90 degrees so they could directly face the patient's head from the doorway. Nurses examined the grab bars, soap dispenser and shower curtain in a realistic intensive care unit room and asked to move electrical outlets in a patient room on the medical/surgical floor.



June 16, 2021


Topic Area: Interior Design


Recent Posts

Contaminants Under Foot: A Closer Look at Patient Room Floors

So-called dust bunnies on hospital room floors contain dust particles that turn out to be the major source of the bacteria humans breathe.


Power Outages Largely Driven by Extreme Weather Events

Almost half of power outages in the United States were caused by extreme weather events.


Nemours Children's Health Opens New Moseley Foundation Institute Hospital


Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.