New HyLite Multi-Mode Tube Simplifies Installation and Replacements


Although, LED lighting has longer lifespan, there comes a time when the they will eventually have to be replaced. A major obstacle on LED Tube Light replacement is not knowing whether the previously installed LED Tube Light is: Ballast Compatible, Direct Wire, with Single-end Wiring or Double-end Wiring, etc. This situation poses a major challenge for Installers and Maintenance Providers.  Identifying the wiring configuration is fairly time consuming and quite frustrating.

HyLite LED new OptiMax™ Tube solves this issue by offering a completely Universal LED Tube Light which is Ballast Compatible & Direct Wire, Single-End or Double-End Wiring Compatible, Works on Shunted/Un-Shunted Sockets - all in one “LED Tube Light Replacement Solution”. HyLite 12W OptiMax™, Multi-mode LED Tube Light will save tremendous amount of time and challenges on maintenance and labor. Simply plug in the OptiMax™ Tube Light without having to worry about any Ballast or Wiring Configuration.

HyLite 12W OptiMax™, Multi-mode LED Tube Light features a highly efficient 150 LPW and is available in 4000K and 5000K.  At 12W, the HyLite LED OptiMax™ Tube saves up to 75% compared to T8 fluorescent tubes.  DLC Listed – Qualifies for Utility rebates.  

The HyLite LED OptiMax Tube features proprietary optical design with a wide and uniform 300° Beam Angle and Shatter-Proof Coating.  Rated for up to 50,000 hours of life, the HyLite LED OptiMax Tube will last up to 5 times longer than Fluorescent tubes.  

 For more information, please visit us at www.HyLiteLEDLighting.com.

 



February 8, 2018


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.