New Joplin hospital built to weather storms

The new facility replaces the tornado-ravaged St. John's Regional Medical Center with a stronger, state-of-the-art hospital


The new 900,000-square-foot, $465 million Mercy Hospital Joplin in Joplin, Mo., was constructed to replace the tornado-ravaged St. John’s Regional Medical Center with a stronger, state-of-the-art hospital, according to an article on the FaciltyCare website.

The hospital patient tower and clinic office include a neonatal intensive care unit, a linear accelerator for cancer treatment, a cutting-edge emergency department and unprecedented “storm hardened” safety features.

“Having windows that can withstand a storm is a huge deal,” Gary Pulsipher, president of Mercy Hospital Joplin, said in the article. “Winds like the ones we experienced in the May 2011 tornado caused major damage and, once inside the building, they tore things apart and sent debris flying. There was no question we needed to prevent that going forward.”

The new structure incorporates a window and frame system that can withstand winds up to 250 miles per hour. 

Mercy also added a concrete roof, fortified “safe zones” on every floor and half-buried generators away from the main building. 

Read the article.

 

 



March 19, 2015


Topic Area: Project News for Healthcare Facilities


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.