New energy management motor starter from Greenheck


MSEM starterGreenheck’s new fully programmable energy management motor starter, Model MSEM, can be specifically adapted to the user’s needs. Available for single-phase (up to15 HP) or three-phase (up to 300 HP) commercial or industrial applications, Model MSEM features a Hand/Off/Auto keypad with LCD display to easily adjust settings. Model MSEM offers five different control inputs including two separate auto run inputs, permissive input, Emergency Shutdown and Fireman’s Override; two status outputs; under/over voltage and under/over power protection; and electronic overload for real-time current monitoring for motor protection. For damper control, Model MSEM can be specified for 24VAC or 120VAC damper power to open the damper when the fan is commanded to start. Model MSEM also has a limit switch input to ensure that the fan does not start until the damper is fully opened.

Options include ground fault protection and time delays, as well as one of four optional boards: power monitoring board, BACnet communications board, Modbus communications board, or Ethernet I/O (fault logging) board.

Greenheck is the worldwide leader in manufacturing and distributing air movement and control equipment.

For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, PO Box 410, Schofield WI 54476-0410, (715)359-6171, FAX (715)355-2399.

 



January 14, 2015


Topic Area: Press Release


Recent Posts

Grounding Healthcare Spaces in Hospitality Principles

Thoughtful design can establish the calm of a spa and the restorative feeling of a resort in healthcare spaces, bringing benefits for patients and care providers.


UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion

Work is already underway with substantial completion anticipated in the fall of 2027.


Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion

The first two floors opened for patients in May 2025 and house the Davenport-Mugar Cancer Center.


Building Sustainable Healthcare for an Aging Population

Traditional responses — building more primary and secondary care facilities — are no longer sustainable.


Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh

The organization broke ground on the health campus in March 2024.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.