New energy management motor starter from Greenheck


MSEM starterGreenheck’s new fully programmable energy management motor starter, Model MSEM, can be specifically adapted to the user’s needs. Available for single-phase (up to15 HP) or three-phase (up to 300 HP) commercial or industrial applications, Model MSEM features a Hand/Off/Auto keypad with LCD display to easily adjust settings. Model MSEM offers five different control inputs including two separate auto run inputs, permissive input, Emergency Shutdown and Fireman’s Override; two status outputs; under/over voltage and under/over power protection; and electronic overload for real-time current monitoring for motor protection. For damper control, Model MSEM can be specified for 24VAC or 120VAC damper power to open the damper when the fan is commanded to start. Model MSEM also has a limit switch input to ensure that the fan does not start until the damper is fully opened.

Options include ground fault protection and time delays, as well as one of four optional boards: power monitoring board, BACnet communications board, Modbus communications board, or Ethernet I/O (fault logging) board.

Greenheck is the worldwide leader in manufacturing and distributing air movement and control equipment.

For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, PO Box 410, Schofield WI 54476-0410, (715)359-6171, FAX (715)355-2399.

 



January 14, 2015


Topic Area: Press Release


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


What To Know Now About OSHA's Updated Hazcom Rule

The update requires careful attention because compliance is not optional, and OSHA has set firm deadlines extending through 2028.


Skills Gap Remains Wide in Facilities Management

Many candidates lack the skills that are needed to be a facilities manager.


Making Healthcare Lighting Retrofits Work

Effective operational planning determines whether a retrofit project improves a facility or creates new problems.


Harris Health to Build New Freestanding Cancer Center

The center is planned to open in 2029, following the opening of the new O'Quinn Hospital along the North Loop at Lockwood.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.