Geisinger Wyoming Valley Medical Center in Plains Township, Pa., is building an $18 million central utility plant that is expected to provide clean energy for decades, according to an article on the Times-Leader website.
Scheduled for a fall completion, the 13,500-square-foot facility’s design will allow GWV to operate independent of the public power grid should a natural disaster strike.
The plant will house a variety of energy-efficient equipment including cogeneration, electric chillers, boilers, chilled water storage, an emergency generator, underground diesel fuel oil storage tanks and a steam turbine chiller.
The projects fits into Geisinger’s broader effort to reduce the Danville-based health system’s carbon footprint.
Grounding Healthcare Spaces in Hospitality Principles
UC Davis Health Selects Rudolph and Sletten for Central Utility Plant Expansion
Cape Cod Healthcare Opens Upper 2 Floors of Edwin Barbey Patient Care Pavilion
Building Sustainable Healthcare for an Aging Population
Froedtert ThedaCare Announces Opening of ThedaCare Medical Center-Oshkosh