In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question on the required width of new corridor


In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question about the required width of new corridor.

Q: We have a corridor that connects an existing elevator lobby on the second floor of a three-story hospital to a new addition. The corridor is used for the transfer of personnel and patients from one building to another. It is not an exit corridor; there are exits on each end of the connector. As designed, the corridor is 7 feet 7 inches clear. Is this width permitted or do we need to re-design to get the 8-foot clear width?

A: All corridors are exit access corridors and are part of the path of egress. They just aren’t all required to be 8 feet wide. Where there are no inpatients, the corridor can be 44 inches wide. In your situation, the corridor between the elevator lobby and the new addition would be considered an exit access corridor because inpatients are wheeled in this corridor. This corridor would have to meet new construction requirements and be a minimum of 8 feet wide because section 18.2.3.3 of the 2000 Life Safety Code (LSC) requires all corridors used by inpatients required for exit access to be 8 feet wide. You attached a new addition to an existing corridor used for the movement of inpatients which requires you to comply with new construction requirements, according to section 4.6.7 of the 2000 LSC.

Read the full answer. 

 

 

 



June 2, 2015


Topic Area: Safety


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.