Q&A on the required width of new corridor

In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question on the required width of new corridor


In a recent Q&A on the FacilityCare website, consultant Brad Keyes answered a question about the required width of new corridor.

Q: We have a corridor that connects an existing elevator lobby on the second floor of a three-story hospital to a new addition. The corridor is used for the transfer of personnel and patients from one building to another. It is not an exit corridor; there are exits on each end of the connector. As designed, the corridor is 7 feet 7 inches clear. Is this width permitted or do we need to re-design to get the 8-foot clear width?

A: All corridors are exit access corridors and are part of the path of egress. They just aren’t all required to be 8 feet wide. Where there are no inpatients, the corridor can be 44 inches wide. In your situation, the corridor between the elevator lobby and the new addition would be considered an exit access corridor because inpatients are wheeled in this corridor. This corridor would have to meet new construction requirements and be a minimum of 8 feet wide because section 18.2.3.3 of the 2000 Life Safety Code (LSC) requires all corridors used by inpatients required for exit access to be 8 feet wide. You attached a new addition to an existing corridor used for the movement of inpatients which requires you to comply with new construction requirements, according to section 4.6.7 of the 2000 LSC.

Read the full answer. 

 

 

 



June 2, 2015


Topic Area: Safety


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.