Rady Children’s Hospital Completes Construction

Ware Malcomb provided the interior architecture and design services for the project.

By HFT Staff


Ware Malcomb announced that construction is complete on the Southern Family Center for Cerebral Palsy at Rady Children’s Hospital in San Diego. Ware Malcomb provided the interior architecture and design services for the project.  

The 6,400-square-foot space is an OSHPD-3 clinic with 12 new exam rooms, casting room, X-ray room, three research offices, staff workrooms and reception area. Rady Children’s new clinic includes a 1,100-square-foot motion analysis laboratory. The lab was designed with an elevated floor with integrated force plates, two ADA-compliant ramps and a truss system for motion capturing cameras. Patient lift systems are located in the x-ray room and patient restroom. An air handling unit on the second floor provides sufficient ventilation and air changes required per OSHPD-3 requirements.   

Project construction was led by general contractor BNBuilders. Rady Children’s Hospital-San Diego has a comprehensive program for the care of children and adults with cerebral palsy. 



April 28, 2022


Topic Area: Construction , Renovations


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.