Q: What is the guidance on clean utility rooms and door closers? Under 50 square feet no closer is required, but more than 50 square feet a closer is required? Does the clean utility room being located inside a suite make any difference? The normal supplies in there could be considered combustible based on the NFPA definition.

A: You have the 50-square-foot limit correct, but it does not matter if the clean utility room is located in a suite or not. It still must meet section 18/19.3.2.1 for hazardous areas. If it is a new clean utility room, then it must be 1-hour fire-rated and be protected with sprinklers. However, the room may meet an exception found in section 43.7.1.2 (2), regarding rehabilitation.

A change in use of a space in an existing healthcare occupancy does not have to meet new construction requirements for hazardous areas, provided the space does not exceed 250 square feet and the entire building is protected with sprinklers. But the space does have to meet the requirements for hazardous areas for existing conditions, which is 1-hour fire rated construction, or if the room is fully protected with sprinklers, then the door just needs to be self-closing and smoke resistant.  

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 



December 13, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.